Hurray, Hurray, the First of May.  Outside diddling starts today!

It was a busy week-end on the Aquaponics building,  The recycled cedar sills were planed, measured, cut and placed in the five windows. The weather was warm and dry enough, plus the building was ready, the linoleum was measured, glued and placed.  This was an event making sure no one fell through the linoleum where the fish tank and sump tank holes are. I have not done linoleum in my past, so it was a great learning experience. We also framed and poured a cement pad so the ramp can be completed onto the porch.